§ 51.65. CITY UTILITIES TO INSPECT CONNECTION.  


Latest version.
  • The applicant for a building service sewer permit shall notify the City Utilities Sewer Collections Division when the building service sewer is ready for inspection and connection to the public sewer 24 hours in advance. Inspection is to be made prior to closing of the trench. The connection of the building service sewer to the public sewer shall be made under the inspection of the Sewer Collections Division Supervisor or his or her representative. Failure to call for an inspection 24 hours prior to the work being started is subject to rejection of the work. To avoid rejection and disconnect of work for this reason, the trench may be re-excavated to expose the building service sewer, at which time an inspection shall be made by the Sewer Collections Supervisor. Directed boring is not excluded.
    (‘89 Code, § 102.19) (Ord. 46-2005, passed 11-14-05)